
Deck Builder
Custom composite, cedar, and pressure-treated decks built for Northwest rain, plus concrete and paver patios that tie your outdoor space together. Permits, railings, and stairs done right.
Get Your Free Deck Estimate
Tell us about your project. We'll call to confirm a time that works for you.
- Free in-home estimateWritten quote, no pressure
- Licensed & insuredWA Lic. #DAWNCCW747K2
- Permits handledWe file and schedule every inspection
- Built for Northwest rainGround-contact lumber, flashed ledgers, drainage
- Rated 4.9 on GoogleBy local homeowners
- Prefer to talk?Call (206) 672-1711
What's Included in a Deck or Patio Project
Our Deck Transformations



We absolutely love our new deck replacement with Dawn Construction WA was fantastic from beginning to end. Jake was professional, responsive, and made sure we were happy with every step of the process. The finished deck looks fantastic and feels very well built.
Beautiful job and great pricing! I had a repair and redeck job. I finally feel safe again on my deck. The crew was respectful the entire time.
Amazing service and professional work! Dawn Construction built our new patio, and we couldn't be happier. The team worked efficiently, finished on time, and paid close attention to every little detail. The patio looks fantastic and completely upgraded our backyard. I highly recommend them to anyone looking for a dependable contractor who delivers great results
Why a Professionally Built Deck Matters
A deck is a structure, not just a floor outside. It carries people, furniture, and snow, it’s attached to your house, and it sits in the rain most of the year. Built right, it adds living space you’ll use for decades. Built wrong, water rots the frame and the ledger where it meets the house, often where you can’t see it.
Dawn Construction builds decks and patios for homeowners in Renton, Bellevue, Kent, Seattle, Mukilteo, and across King and Snohomish counties. One team handles the design, permit, framing, decking, railings, and final walkthrough.
Signs It’s Time for a New Deck
- You never use the yard because there’s no comfortable place to sit or eat outside.
- The old deck is past saving: boards are split and gray, and refinishing no longer helps.
- You want less upkeep and are ready to move from wood to composite.
- The layout doesn’t work: too small, awkward stairs, or no shade.
- Getting ready to sell: outdoor living space is one of the first things buyers notice.
Warning Signs That Need Attention Now
| The Warning Sign | The Hidden Problem | The Required Action |
|---|---|---|
| Soft or spongy boards | Water has rotted the decking, and possibly the joists below. | Open the area, check the joists, and replace rotted framing before new boards go on. |
| Railing that moves when you lean on it | Loose or rotted posts and connections. | Rebuild the guard posts and connections to code. |
| Gap or stains where the deck meets the house | The ledger flashing failed and water is reaching the ledger or house framing. | Remove the decking at the house, repair the ledger, and re-flash it. |
| Bouncy or sagging deck | Undersized or damaged joists or beams. | Inspect the structure and reinforce or rebuild it. |
| Rusted hangers and fasteners | Corroding metal connectors that hold the frame together. | Replace connectors with hardware rated for treated lumber. |
| Loose or uneven stairs | Failing stringers or footings. | Rebuild the stairs on solid footings. |
Types of Decks
Here’s how the most common deck projects compare, so you can see where yours fits before the estimate.
| Deck Type | Best For | What’s Included |
|---|---|---|
| Ground-level deck | Flat yards, simple outdoor seating | Low platform, often no railing; fewer permit triggers |
| Raised deck | Sloped lots, decks off a main floor | Posts, footings, beams, railings, and stairs |
| Multi-level deck | Large or sloping yards, separate dining and lounge zones | Two or more connected platforms with steps between |
| Deck replacement | Worn decks on a frame that’s still sound | New decking, railings, and stairs on the inspected frame |
| Full rebuild | Rotted or unsafe decks | Demolition, new footings and framing, new decking |
Composite vs Wood Decking
Material is the biggest choice you’ll make, and in our climate it comes down to upkeep.
| Compare | Capped Composite | Western Red Cedar | Pressure-Treated |
|---|---|---|---|
| Upkeep in our rain | Wash at least twice a year | Clean and refinish every few years | Clean and seal regularly |
| Rot resistance | Boards don’t rot | Heartwood is naturally decay-resistant | Depends on treatment level |
| Look over time | Holds its color under a fade warranty | Weathers to silver-gray if left unfinished | Weathers gray; can check and split |
| Manufacturer warranty | 25 to 50 years by product line (Trex) | None on the wood | Varies by treater |
| Up-front cost | Highest | Middle | Lowest |
Full comparison: composite vs cedar vs pressure-treated decking.
Patios: Concrete and Paver Patios
A patio gives you a ground-level outdoor space without railings or stairs. It works on its own for a fire pit, outdoor dining, or a hot tub pad, and it pairs well with a deck: the deck off the house for dining, the patio below for a lounge area. We plan both together so the levels, drainage, and access work as one space.
Concrete vs Paver Patios
| Compare | Concrete Patio | Paver Patio |
|---|---|---|
| What it is | One continuous poured slab, with plain, broom, or decorative finishes | Individual concrete or stone units set on a compacted base |
| Look | Clean and simple; finish and color options | Patterns, borders, and textures |
| Repairs | Cracks are patched; repairs can show | Units can be lifted and reset in one spot |
| Upkeep | Occasional cleaning; sealing if specified | Cleaning and topping up joint sand; keep joints clear of moss and weeds |
| Best for | Large, simple areas and hot tub pads | Custom shapes, walkways, and areas you may change later |
Deck or Patio?
| Your Yard | Better Fit | Why |
|---|---|---|
| Flat yard at ground level | Patio | No framing, railings, or stairs needed |
| Door well above the yard, or a sloped lot | Deck | A deck brings the outdoor space level with the house |
| Both: raised door and a usable yard below | Deck plus patio | Dining on the deck, a lounge or fire pit area on the patio |
Patios Built for Our Rain
- Slope away from the house so water drains away from your foundation, not toward it.
- A compacted base under pavers and slabs to limit settling in wet soil.
- Drainage planned with the deck so runoff from the deck doesn’t pool on the patio.
Ground-level patios usually need fewer permits than decks. In Seattle, for example, platforms and walks 18 inches or lower that aren’t over a basement don’t need a building permit. We confirm what your city requires at the estimate. More in our paver patio guide for Seattle and our guide to paver walkways and paths.
Our Deck Building Process
Step 1: Free In-Home Estimate
We measure the site, check the slope and the house connection, talk through your goals and budget, and send a detailed written estimate.
Step 2: Design & Materials
We finalize the size, layout, decking, railings, and stairs.
Step 3: Permit & Ordering
We file the permit your city requires and order all materials up front.
Step 4: Footings & Framing
Footings, posts, beams, joists, and a properly flashed ledger, inspected where required.
Step 5: Decking, Railings & Stairs
Boards, guards, and stairs installed to code.
Step 6: Final Inspection & Walkthrough
A final inspection and a walkthrough with you, plus care instructions for your decking.
Decks Built for Northwest Rain
Seattle-Tacoma averages about 39 inches of rain a year, spread over many damp days from fall to spring. Decks here fail from water long before they wear out from use, so we build every one to shed and survive it.
| Detail | What We Do | Why It Matters |
|---|---|---|
| Ground-contact lumber | UC4A-rated treated wood for posts and framing near soil | Above-ground-rated lumber can rot when it stays damp |
| Ledger flashing | Flashing where the deck attaches to the house | Keeps water out of the ledger and your home’s framing |
| Drainage gaps | Board spacing so water and debris clear | Standing water feeds mold and rot |
| Structural design | Framing sized for Washington’s 60 psf deck load | Washington’s deck load is higher than the 40 psf used in many states |
| Rated hardware | Connectors and fasteners rated for treated lumber | Prevents corrosion that weakens the frame |
Deck Railing and Stair Guide
| Item | Requirement | Notes |
|---|---|---|
| When a guard is required | Deck surface more than 30 inches above the ground | Measured within 36 inches horizontally of the edge |
| Guard height | At least 36 inches on residential decks | Many homeowners choose taller for comfort |
| Baluster spacing | A 4-inch sphere must not pass through | Protects small children |
| Posts and footings | Sized for the deck’s height and load | Raised decks need engineered post and footing sizes |
Deck Cost: What Affects the Price
Every deck is priced individually, because the site and the materials decide the cost. You get an exact price in writing after a free in-home estimate.
| Pricing Factor | Impact on Total Cost | Why It Matters |
|---|---|---|
| Size and shape | More square feet and corners mean more material and labor | Simple rectangles are the most efficient |
| Height and slope | Raised decks need taller posts, bigger footings, railings, and stairs | Height also changes the permit requirements |
| Decking material | Composite costs more up front than wood | Lower upkeep can offset the difference over time |
| Railings | Style and material vary widely | Required on decks over 30 inches |
| Stairs | Each run adds framing, footings, and guards | Wide or multiple stairs add the most |
| Old deck removal and repairs | Demolition and ledger repair add scope | Hidden rot must be fixed before the new deck goes on |
What’s Included in Our Service
- Free in-home estimate and a detailed written quote
- Design help and material selection
- All permits and inspections, handled for you
- Site protection and daily cleanup
- Final walkthrough with you before we call the job done
- One-year workmanship warranty on all completed work
Want to spread the cost? See our financing options.
Deck Permits in Washington
Permit rules depend on your city, and they differ more for decks than for most projects. We check your city’s rules at the estimate and handle the permit and inspections.
| City or Rule | When a Deck Permit Is Required |
|---|---|
| Renton | More than 30 inches above grade, measured within a 5-foot perimeter, or any work in a critical area |
| Seattle | More than 18 inches above the ground, any roof deck, or any deck in an environmentally critical area |
| Common state exemption | Exempt only if 200 sq ft or less, 30 inches or less, freestanding, and not serving a required exit door |
City guides: deck permits in Renton, deck permits in Seattle, deck permits in Everett, plus patio and deck covers in Renton and deck repair in Renton.
Deck Care and Maintenance
| Decking | Cleaning | Finishing |
|---|---|---|
| Capped composite | At least twice a year, more under trees | Not needed |
| Cedar | Before each refinish | Clear water repellent about yearly, or a penetrating stain every few years |
| Pressure-treated | Before each seal | Seal regularly to limit checking and splitting |
Not sure whether yours needs care or a rebuild? See how to refinish or replace your deck.
DIY vs Professional Deck Building
| Factor | DIY Deck | Professional Deck |
|---|---|---|
| Structure | Span and footing sizes are easy to get wrong | Framing sized for Washington’s 60 psf deck load |
| House connection | Ledger flashing is often skipped | Flashed and fastened to keep water out of your home |
| Permits | You file, draw, and schedule inspections | Permit and inspections handled |
| Railings and stairs | Code details are easy to miss | Built to guard height and baluster rules |
| Time | Many weekends | A planned schedule with materials on site |
| Warranty | None | One-year workmanship warranty plus manufacturer warranties |
Good DIY deck projects include cleaning, re-staining a wood deck, and replacing a few surface boards on a sound frame. Anything structural, attached to the house, or raised off the ground is worth a professional.
What Makes Our Decks Different
- One team, start to finish: design, permit, framing, decking, and railings under one roof.
- Built for Northwest rain: ground-contact lumber, flashed ledgers, and drainage on every deck.
- Permits handled: we file, schedule inspections, and make sure the work passes.
- Clear pricing: a detailed written estimate before any work starts.
- One-year workmanship warranty: on every completed project.
- Licensed and verifiable: WA Lic. #DAWNCCW747K2.
Upgrade Your Outdoor Space with a Professionally Built Deck
Get a free in-home estimate and a detailed written quote. No pressure, no obligation.
FAQ – Decks & Patios
How much does a new deck cost?
It depends on the size, height, decking material, railings, and stairs. Composite usually costs more up front than wood but needs less upkeep. You get an exact price in writing after a free in-home estimate.
Should I choose composite or wood decking?
Choose capped composite if you want the least upkeep in our rain; it only needs washing. Choose cedar if you want real wood and don’t mind refinishing every few years. Pressure-treated lumber costs least up front but needs regular cleaning and sealing.
How long does a deck last in the Pacific Northwest?
It depends on the material and the upkeep. Capped composite boards carry manufacturer warranties of 25 to 50 years depending on the product line, while wood decks last longest when they are kept clean and refinished on schedule.
Do I need a permit to build a deck in Washington?
It depends on your city. Renton requires a permit for decks more than 30 inches above grade, while Seattle requires one above 18 inches. Attached decks and decks over 200 square feet usually need a permit too. We handle the permit and inspections for you.
How high can a deck be before it needs a railing?
A guard is required where the deck surface is more than 30 inches above the ground. Residential guards must be at least 36 inches tall, and balusters must be close enough that a 4-inch sphere can’t pass through.
Can you replace my deck boards and keep the old frame?
Sometimes. If the joists, beams, posts, footings, and ledger are sound, new decking can go on the existing frame. We inspect the structure first, because new boards on a failing frame won’t last.
How do you keep a deck from rotting in our rain?
We use ground-contact treated lumber (UC4A) for posts and framing near the soil, flash the ledger where the deck meets the house, and leave gaps so water drains. Then we recommend the right cleaning and finishing schedule for your decking.
How often should I stain a cedar deck?
A clear water-repellent finish lasts about a year on a deck. A penetrating semi-transparent stain lasts longer; the Western Red Cedar Lumber Association cites maintenance coats every 2 to 4 years for one product it recommends.
Do you build patios too?
Yes. We build concrete and paver patios, on their own or together with a deck, and plan the levels and drainage so the outdoor space works as one.
Should I choose a concrete or paver patio?
Concrete is one continuous slab with a clean look and works well for large, simple areas. Pavers are individual units with more pattern options, and a section can be lifted and reset if it settles. Pavers need their joint sand topped up and kept clear of moss.
Do I need a permit for a patio?
Ground-level patios usually need fewer permits than decks. In Seattle, platforms and walks 18 inches or lower that aren’t over a basement don’t need a building permit. Rules vary by city, so we confirm yours at the estimate.
Do you offer a warranty on decks?
Yes. Every completed project comes with a one-year workmanship warranty, and manufacturer warranties on decking and materials are passed through to you.
Do you offer financing for decks?
Yes. We offer financing options so you can spread the cost into monthly payments. Ask about it during your free estimate.
Other Services We Provide
Decks & Patios Across 9 Western Washington Counties
From our offices in Renton and Mukilteo, we build decks and patios in 45 cities, from Bellingham to Olympia. Cities with a link have their own page. See the full service area.
King County
- Renton
- Seattle
- Bellevue
- Kent
- Federal Way
- Redmond
- Issaquah
- Bothell
- Kirkland
- Sammamish
- Mercer Island
- Newcastle
- Auburn
- Tukwila
- SeaTac
- Burien
- Shoreline
- Kenmore
- Covington
- Maple Valley
Snohomish County
- Mukilteo
- Everett
- Lynnwood
- Marysville
- Arlington
- Monroe
- Snohomish
Pierce County
- Tacoma
- Puyallup
- Lakewood
- Gig Harbor
- Eatonville
Kitsap County
- Bremerton
- Silverdale
- Poulsbo
- Kingston
Thurston County
- Olympia
- Yelm
Island County
- Oak Harbor
- Coupeville
Skagit County
- Mount Vernon
- Burlington
- Sedro-Woolley
Whatcom County
- Bellingham
Mason County
- Shelton
Don't see your city? Contact us or call (206) 672-1711.
Sources
- City of Renton, Building Permits FAQ
- Seattle Department of Construction and Inspections, Decks and Tip 312
- Washington State Register, WSR 21-16-006 (Washington deck span tables, 60 psf deck load)
From our blog: learn about how composite, cedar, and pressure-treated decking compare, deck permit rules in Renton, deck permit rules in Seattle and refinish or replace your deck.
Why Dawn Construction
Licensed & Insured
Fully credentialed for your peace of mind and protection on every project.
Full Team, Real People
Call Sunday–Friday, 8am–10pm and a real person from our team will answer.
Transparent Pricing
No hidden fees or surprise costs. We respect your budget.
Start Your Outdoor Project
Ready to build the perfect backyard getaway? Reach out for a free, no-obligation estimate.
Ready to Get Started?
Call or email us directly — we're available Sunday–Friday, 8am–10pm and respond fast.
Call (206) 672-1711


