
Kitchen Remodeling
The heart of your home deserves expert craftsmanship. Custom layouts, modern finishes, and functional design for everyday family life.
Get Your Free Kitchen Estimate
Tell us about your project. We'll call to confirm a time that works for you.
- Free in-home estimateWritten quote, no pressure
- One team, start to finishDesign, permits, trades, and finish work
- Financing available$0 down on approved credit
- Licensed & insuredWA Lic. #DAWNCCW747K2
- Rated 4.9 on GoogleBy local homeowners
- Prefer to talk?Call (206) 672-1711
What's Included in a Kitchen Remodel
Our Kitchen Transformations



Outstanding experience from start to finish! This is hands down the best construction company I’ve worked with. The team was professional, honest, and extremely detail-oriented throughout the entire project. Their craftsmanship, communication, and quality of work exceeded all expectations.
Read moreShow less
They completed the job on time, stayed within budget, and kept the worksite clean every day. If you’re looking for a reliable general contractor for home remodeling, renovations, custom construction, or residential construction, I highly recommend this company. Their commitment to quality, customer service, and attention to detail truly sets them apart.
I wouldn’t hesitate to hire them again for future projects. Five-star service and exceptional results!
Kitchen Remodeling in Seattle & the Puget Sound
Dawn Construction is a licensed Washington kitchen remodeling contractor serving 45 cities across Greater Seattle and the Puget Sound. We handle everything from cabinet and countertop updates to full remodels with new layouts, plan the permits and trades, and back every project with a one-year workmanship warranty.
One team runs your kitchen from the free in-home estimate to the final walkthrough, with offices in Renton and Mukilteo, so you're not coordinating separate trades.
Our Kitchen Remodeling Services
- Full kitchen remodels: a complete renovation, from demolition to the final walkthrough, including cabinets, counters, flooring, lighting, and appliances.
- Kitchen cabinets: new cabinets or refaced doors and drawer fronts, in the existing layout or a new one.
- Countertops: new counters for the perimeter and island, with sink and cooktop cutouts.
- Layout changes and open kitchens: moving or removing walls, relocating the sink or range, and opening the kitchen to living space.
- Kitchen islands: new islands with seating, storage, and outlets, planned for clearances and wiring.
- Backsplash and flooring: tile backsplashes and durable kitchen flooring installed as part of the remodel.
- Lighting and electrical: recessed and under-cabinet lighting, new circuits, and 240-volt circuits for induction ranges.
- Range hoods and ventilation: ducted hoods sized to Washington's exhaust minimums, with makeup air when needed.
Types of Kitchen Remodels
Most kitchen projects fall into one of three levels. The level decides the budget and which permits apply.
| Remodel Type | What Changes | Permits | Best For |
|---|---|---|---|
| Kitchen refresh | Cabinet doors or cabinets, counters, sink, backsplash, flooring; same layout | Often none for finish work; trade permits if wiring or plumbing changes | Updating the look and function on a tighter budget |
| Full remodel, same layout | All-new cabinets, counters, lighting, appliances, flooring | Usually electrical and plumbing permits | Kitchens with a layout that works but worn or outdated everything else |
| Full remodel, new layout | Walls moved or removed, sink or range relocated, island added | Building permit plus trade permits | Opening the kitchen, adding space, or fixing a layout that doesn't work |
When Is It Time to Remodel Your Kitchen?
- The layout doesn't work: too little counter space, a cramped work area, or no room for more than one cook.
- Cabinets are failing: sagging shelves, loose hinges, or water damage under the sink.
- Not enough outlets or light: extension cords on the counter and dark work areas.
- You're switching to induction: a new range circuit is easiest to add during a remodel.
- Poor ventilation: cooking smells and moisture linger without a ducted hood.
- You're planning to sell: a kitchen refresh has been one of the remodels that recoup the most at resale in the Seattle market.
Permits & Rules for Kitchen Remodels in Washington
Each city runs its own permit office, but a few rules apply across the Puget Sound. We plan for all of them before work starts.
| Rule | When It Applies | What It Means for Your Kitchen |
|---|---|---|
| Finish work exemption | Cabinets, countertops, tile, and paint in the same layout | Usually no building permit needed |
| Trade permits | New wiring, plumbing, or gas lines | Separate electrical, plumbing, or mechanical permits from your city |
| Structural permits | Moving or removing walls, new or larger windows | A building permit, and sometimes engineered plans |
| Asbestos survey | Before renovation or demolition in the Puget Sound region | Required by Puget Sound Clean Air Agency and L&I rules before tear-out |
| Kitchen ventilation | Any new or replaced range hood | At least 100 cfm intermittent or 25 cfm continuous; larger hoods may need makeup air |
City-specific guides: kitchen remodeling in Seattle (SDCI and Public Health permits) and kitchen remodel permits in Renton.
Should You Reface or Replace Your Kitchen Cabinets?
| Compare | Refacing | Replacing |
|---|---|---|
| What happens | Existing boxes stay; new doors, drawer fronts, and outer surfaces | Old cabinets come out; all-new boxes, doors, and hardware |
| Layout | Stays the same | Can change completely |
| Best when | Boxes are solid and the layout works | Boxes are damaged, or you want a new layout or island |
| Budget | Lower | Higher |
Our Kitchen Remodel Process
Step 1: Free In-Home Estimate
We measure the kitchen, talk through your goals and budget, and follow up with a written quote.
Step 2: Design & Selections
You choose the layout, cabinets, counters, fixtures, and appliances.
Step 3: Asbestos Survey & Permits
The asbestos survey comes first, then the permits your scope needs.
Step 4: Demolition & Rough-In
Old finishes come out; wiring, plumbing, and ventilation go in and are inspected.
Step 5: Install & Finish
Cabinets, counters, backsplash, flooring, lighting, and appliances.
Step 6: Final Walkthrough
We review every detail with you before the job closes.
Kitchen Remodel Cost – What to Expect
Every kitchen is priced individually, because the scope decides the cost. A refresh in the same layout costs far less than a full remodel that moves walls, plumbing, and wiring. You always get a realistic estimate for your kitchen, in writing, before work begins.
A smaller project can also pay for itself. In the 2025 Cost vs. Value Report for Seattle, a midrange kitchen refresh recouped 118.1% of its cost when the home sold.
Factors That Affect Kitchen Remodel Cost
| Price Factor | Effect on Cost | Why It Matters |
|---|---|---|
| Layout | Moving the sink, range, or walls adds the most | New plumbing, wiring, structural work, and permits |
| Cabinets | Refacing costs less than all-new boxes | Cabinets are usually the largest single line item |
| Countertops and finishes | Material choice swings the budget widely | Counter run and island size multiply the material cost |
| Appliances | Standard versus pro-style and built-in models | Some appliances need new circuits or ventilation |
| Electrical and ventilation | New circuits, lighting, and hoods add trade work | Each trade needs its own permit and inspection |
Financing Your Kitchen
- $0 down on approved credit
- 12 to 120 month loan terms
- Same-day pre-approval decision for most homeowners
Applying is free, with no obligation. See all financing options.
What Makes Our Kitchen Remodels Different
- Licensed and verifiable: WA Lic. #DAWNCCW747K2. You can check any contractor on L&I's Verify tool.
- One team, start to finish: the same team runs your project from estimate to final walkthrough.
- Permits planned for you: we map the permits your city requires before work begins.
- Clear pricing: a written quote after a free in-home estimate, before any work starts.
Our Service Promise
Every completed project is backed by our one-year workmanship warranty.
Ready to Plan Your New Kitchen?
Get a free in-home estimate and a written quote. No pressure, no obligation.
FAQ – Kitchen Remodeling
How much does a kitchen remodel cost?
It depends on the scope. Layout changes, cabinets, countertops, appliances, and electrical work drive the price, and a refresh in the same layout costs far less than a full remodel with a new layout. Dawn Construction gives a written quote after a free in-home estimate, and financing is available.
Does a kitchen remodel add value to my home?
A kitchen refresh usually does. The 2025 Cost vs. Value Report found a midrange minor kitchen remodel in Seattle recouped 118.1% of its cost at resale, while a midrange major remodel recouped 53.1%.
Do I need a permit to remodel a kitchen in Washington?
It depends on your city and the work. New cabinets and countertops in the same layout usually don't need a building permit, but moving walls, adding windows, or new wiring, plumbing, or gas lines do. Each city runs its own permit office, so the rules differ between places like Seattle and Renton.
Should I reface or replace my kitchen cabinets?
Refacing keeps your existing cabinet boxes and replaces the doors, drawer fronts, and outer surfaces, so it costs less and fits a same-layout refresh. Replacing is the better choice when the boxes are damaged or you are changing the layout.
Can I switch from a gas range to induction during my remodel?
Yes. Most induction ranges need a dedicated 240-volt circuit, which means electrical work and an electrical permit. Plan the circuit early so it is part of the remodel.
Is an asbestos survey required before a kitchen remodel?
In the Puget Sound region, Puget Sound Clean Air Agency and Washington L&I rules require an asbestos survey before renovation or demolition. The survey comes before any tear-out.
How big should my kitchen range hood be?
Washington energy code forms list a minimum kitchen exhaust of 100 cfm for a fan that runs intermittently, or 25 cfm for continuous operation. Larger hoods may need makeup air.
Which areas do you serve for kitchen remodeling?
Dawn Construction remodels kitchens in 45 cities across King, Snohomish, Pierce, Kitsap, Thurston, Island, Skagit, Whatcom, and Mason counties, from Bellingham to Olympia.
Do you offer free estimates and financing?
Yes. Every kitchen project starts with a free in-home estimate and a written quote, and financing is available. See our financing page.
Other Services We Provide
Kitchen Remodeling Across 9 Western Washington Counties
From our offices in Renton and Mukilteo, we remodel kitchens in 45 cities, from Bellingham to Olympia. See the full service area.
King County
- Renton
- Seattle
- Bellevue
- Kent
- Federal Way
- Redmond
- Issaquah
- Bothell
- Kirkland
- Sammamish
- Mercer Island
- Newcastle
- Auburn
- Tukwila
- SeaTac
- Burien
- Shoreline
- Kenmore
- Covington
- Maple Valley
Snohomish County
- Mukilteo
- Everett
- Lynnwood
- Marysville
- Arlington
- Monroe
- Snohomish
Pierce County
- Tacoma
- Puyallup
- Lakewood
- Gig Harbor
- Eatonville
Kitsap County
- Bremerton
- Silverdale
- Poulsbo
- Kingston
Thurston County
- Olympia
- Yelm
Island County
- Oak Harbor
- Coupeville
Skagit County
- Mount Vernon
- Burlington
- Sedro-Woolley
Whatcom County
- Bellingham
Mason County
- Shelton
Don't see your city? Contact us or call (206) 672-1711.
Sources
- Journal of Light Construction / Zonda, 2025 Cost vs. Value Report: Seattle, WA
- City of Tukwila, Permit Exemptions (2021 codes), under the 2021 International Residential Code
- City of Renton, Residential Interior Remodels (asbestos survey requirement, PSCAA and L&I)
From our blog: learn about induction vs gas cooktops and kitchen remodel permits in Renton.
Planning a project in Seattle? See kitchen remodeling in Seattle.
Why Dawn Construction
Licensed & Insured
Fully credentialed for your peace of mind and protection on every project.
Full Team, Real People
Call Sunday–Friday, 8am–10pm and a real person from our team will answer.
Transparent Pricing
No hidden fees or surprise costs. We respect your budget.
Start Your Kitchen Remodel
Ready to build your dream kitchen? Reach out for a free, no-obligation estimate.
Ready to Get Started?
Call or email us directly — we're available Sunday–Friday, 8am–10pm and respond fast.
Call (206) 672-1711